# Zero-Downtime Schema Migrations on a Rolling Deploy

> A rolling deploy runs the old release and the new one against one schema for a window you do not control. The deploy mechanics that decide what a migration may do.

URL: https://www.matthewswong.com/en/blog/zero-downtime-migration-rolling-deploy/

- Author: Matthews Wong (https://www.matthewswong.com/en/about/)
- Published: 2026-09-24
- Updated: 2026-09-24
- Category: DevOps

> **Key takeaway:** A rolling deploy runs the previous release and the new one against one schema at the same time, for a window that a stalled rollout can extend without limit. Every migration must therefore be compatible in both directions: run it once as a release-phase job, never in application bootstrap, and never drop anything a rollback would need.

The migration had already run. The rollout had not. New pods were coming up and failing their readiness probe, old pods were still serving traffic against a schema that had changed underneath them, and the release I would have rolled back to was the one release that could not read that schema. Nothing was down. Everything was one command away from being down.

This post is about the deploy, not the SQL. Expand-then-contract is covered elsewhere on this blog and I will treat it as known here. What I want to pin down is the constraint that makes it necessary in the first place: during a rolling update the old release and the new one run simultaneously against a single schema, for a window whose length you do not control, so every statement in the migration has to be correct for both of them. The mechanics below come from the Kubernetes Deployment and Pod lifecycle documentation, the PostgreSQL advisory lock reference, and the Helm chart hooks guide.

## The overlap window is a state, not a moment

The first thing to get right is that the window is not the few seconds between two versions. It is a state the system sits in, and its length is decided by fields most teams never set. A Deployment with the RollingUpdate strategy scales the old ReplicaSet down and the new one up under two limits, maxUnavailable and maxSurge, both of which default to 25 percent. A new pod only counts towards the rollout once it is available, and a pod is available once it is ready and has stayed ready for minReadySeconds, which defaults to zero. Gate readiness on a real health check and the window becomes as long as your slowest pod takes to warm up, multiplied by the number of batches the two limits allow.

The part that changes the design is what happens when the rollout does not finish. If new pods fail their readiness probe, the Deployment controller stops scaling the new ReplicaSet up, and the documentation is explicit that this depends on maxUnavailable. Set a progress deadline and after progressDeadlineSeconds, which defaults to 600, the controller adds a condition with reason ProgressDeadlineExceeded. It does nothing else. The docs say so in as many words: Kubernetes takes no action on a stalled Deployment other than to report a status condition. Pausing a rollout suspends the deadline check entirely, so a paused Deployment sits in the overlap state for as long as you leave it there.

There is a tail at the clean end of it too. When the last old pod is finally deleted it is granted a termination grace period, which defaults to 30 seconds, and any preStop hook runs inside that budget. So even a rollout that goes perfectly ends with the previous release still holding open connections and finishing in-flight requests against the new schema. The honest way to plan a migration is to assume the overlap lasts minutes and may last until someone notices.

## The migration that runs once per replica

The most common way to break this is to run migrations from the application's own start-up path. It looks tidy, it works on a laptop with one process, and it fails the moment there is more than one replica, because every new pod runs the same migration at the same time. Moving it into an init container does not help: init containers run per Pod, so the work is now multiplied by pod count instead of by process count. What you want is a job that runs once per release, and neither of those is that.

What actually happens when two replicas start the same migration together is worth spelling out, because the double-apply is not the expensive part. The first connection takes its lock and applies the change. The second queues behind it, then either applies the same change again or fails on an error such as the column already existing. A migration that throws at start-up takes the pod with it, the pod crash-loops, the crash-looping pod never passes readiness, and a rollout with no ready pods is exactly the stalled rollout from the previous section. The bug is a race in the entrypoint; the outage is an overlap window that will not close.

If the migration must run from somewhere you cannot make single-shot, guard it with a PostgreSQL advisory lock. Advisory locks are application-defined and the server does not enforce their use, so they are a convention your migration runner keeps with itself, which is precisely what is needed here. Take a session-level lock on a constant key: pg_try_advisory_lock returns false immediately rather than waiting, so the losing replica can skip the migration and carry on instead of blocking start-up. Session-level advisory locks do not honour transaction semantics, so a rolled-back transaction still holds the lock, and pg_advisory_unlock_all is invoked implicitly at session end even when the client disconnects ungracefully. That last property is the reason a killed migration pod does not leave the lock stuck forever.

> Do not run the migration through a transaction-pooling connection pooler. A session-level advisory lock is only meaningful while the session is yours for the whole job, and transaction pooling hands your statements to whichever backend is free. Point the migration at the database directly.

## Run it once, before any pod is replaced

The pattern that removes the whole class of problem is a release-phase job: one container, run to completion, before the rollout starts. In Helm that is a pre-upgrade hook, which the documentation describes as executing on an upgrade request after templates are rendered but before any resources are updated. When the hook resource is a Job, Helm waits until it runs to completion, and if the hook fails the release fails. It is a blocking operation, which is the point.

Read what that buys you in terms of the overlap window. A migration that fails now produces zero new pods, so there is no version skew at all to reason about, only a release that did not happen. A migration that succeeds is finished before the first new pod is scheduled, so the window opens with the schema already in its final state and only one variable left: whether the old release can live with it. Give the hook an explicit weight, because Helm sorts hooks by weight in ascending order and assigns zero by default, and set a delete policy or a Job TTL, because hook resources are not tracked as part of the release and completed jobs otherwise accumulate.

> The same shape exists without Helm. Any mechanism that runs one container to completion and refuses to proceed on failure will do: a platform release phase, a CI job that waits on the migration before applying the new image, or a plain Job you apply and wait on. What matters is that it is one execution per release, not one per replica, and that the rollout is downstream of its exit code.

*The second band is the one every migration has to satisfy, but the last band is the one that decides what the migration is allowed to do at all.*

## Compatible in both directions, not just forwards

A migration is not safe or unsafe on its own. It is compatible, or not, with the specific pair of releases that will be running while it lands. So there are two questions per change, and most reviews only ask the first. Can the new release run against the new schema? And can the previous release, which is still serving traffic and which a rollback would bring back in full, also run against the new schema? The table below is how I sort a change set before writing any SQL.

Change

What the previous release does with it

One deploy?

What it needs instead

Add a new table

Never queries it, never notices

Yes

Nothing

Add a nullable column

Its mapped column list omits the new name

Yes

Nothing

Add NOT NULL to a column

Its inserts omit the column and start failing

No

Default and backfill first, constrain last

Rename a column

Selects a column that no longer exists

No

Add, dual-write, switch reads, drop

Drop a column

Still lists it in every generated SELECT

No

Stop writing it one release, drop it the next

Change a column type

Reads a value its mapping rejects

No

New column, dual-write, switch reads, drop

Add a unique constraint

Keeps writing the duplicates it was allowed to write

No

Deduplicate, build the index concurrently, then enforce

Only the first two rows are single-deploy changes, and that ratio is the finding. The interesting question is what backwards compatible actually means in practice, because compatible with every release ever shipped is not a workable target. It means compatible with the revision you could roll back to, and Kubernetes stores that revision history in the old ReplicaSets it keeps around: ten by default, and once an old ReplicaSet is deleted you lose the ability to roll back to it. So the target is the immediately previous release, and you keep that target easy by deploying often enough that the previous release is never more than one schema step behind.

## The backfill is a job, not a deploy step

Filling a new column for existing rows is the step people staple onto the migration, and it is the one thing in this whole sequence that must not be attached to a deploy at all. A backfill can run for longer than any sensible rollout window, so blocking the release phase on it means the overlap window lasts exactly as long as the backfill does. It also needs to be stoppable halfway through, and a release phase is a bad place to be interruptible. The migration adds the column; a separate job fills it; a later deploy reads it.

Two properties make that job safe to leave running. It is batched over a bounded key range with each batch in its own transaction, so it can be stopped, restarted and resumed from where it left off without holding anything open, and it records its own progress rather than recomputing it. And the code on both sides of it has to tolerate a half-filled column for the whole duration, which is a property of the application, not of the job. That is the real reason the backfill sits between two deploys instead of inside one: the release that requires the column to be complete is the release you ship after the job has finished, and until then nothing may depend on it.

## Rollback is the constraint, and it runs backwards

A rollback is not an undo. Running kubectl rollout undo starts another rolling update in the opposite direction, which means the overlap state happens a second time, with the same two releases, against the schema you already changed. The schema does not roll back with the pods, and nothing in the deploy tool pretends otherwise. That single fact makes a destructive migration and a rollback mutually exclusive: if the migration dropped a column, the previous release cannot come back, and you have traded your fastest recovery mechanism for one deploy's worth of tidiness.

So the rule I now hold to is that the contract step never ships in a release I might want to undo. The drop waits until the release that stopped using the column has been the only one running for a full cycle, and by then the undo target no longer needs the column either. Treat reversibility as a property of the migration rather than of the pipeline, and check it the same way every time: look at what you would roll back to before you write the change.

> Before writing the migration, run kubectl rollout history on the Deployment and look at the revision one line above current. That is the code your rollback brings back. If it cannot run against the schema you are about to create, the migration is the thing to change, not the rollback plan.

*The third panel is not a list of bad SQL. Every line in it is a correct statement that only becomes an outage because two releases are live at once.*

## A rename, deploy by deploy

Here is the canonical rename from the deploy side, which is the view the pattern write-ups tend to leave out. The SQL is the easy half. What matters on a rolling deploy is what is true of the running code at every step, including the code you are trying to replace, and whether you can still walk backwards from where you are standing.

Step

Previous release

New release

Roll back?

Deploy 1: add the column, write both

Reads and writes the old column, ignores the new one

Writes both, reads the old

Yes, nothing reads the new column

Backfill job, between deploys

Unchanged, still serving

Unchanged, still serving

Yes, stop the job

Deploy 2: read the new column

Writes both, reads the old

Reads the new, writes both

Yes, both columns are current

Deploy 3: stop writing the old column

Reads the new, writes both

Reads and writes the new only

Yes, the old column is still there

Deploy 4: drop the old column

Reads and writes the new only

Reads and writes the new only

No, and that is the whole point

Notice that the previous release column and the new release column never disagree about a name in the same row. That is the invariant the four deploys exist to hold, and it is checkable by reading the table rather than by reasoning about SQL. Notice also where the no appears: only in the last row, and only after the previous release has already been brought up to the new shape. If your sequence puts a no anywhere earlier, you have not split the deploys finely enough.

What changed for me is the question I ask first. It used to be whether the migration was safe, which is a question about SQL and has no answer on its own. Now it is which two releases will be running while this lands, and can both of them live with it. Everything else falls out of that: the job runs once because a per-replica migration stalls the rollout that defines the window, the backfill sits outside the deploy because it is longer than the window, and the drop waits because the window opens again the moment you roll back.

## Sources

- Kubernetes Documentation - Deployments: rolling update strategy, maxUnavailable and maxSurge defaults, minReadySeconds, progressDeadlineSeconds, revision history and rollout undo
- Kubernetes Documentation - Pod Lifecycle: readiness probes, pod termination flow and the default termination grace period
- PostgreSQL Documentation - Explicit Locking, section 13.3.5 on advisory locks and their session and transaction levels
- PostgreSQL Documentation - Advisory Lock Functions: pg_try_advisory_lock, pg_advisory_unlock and pg_advisory_unlock_all
- Helm Documentation - Chart Hooks: the pre-upgrade hook, hook weights, waiting on a Job to completion and hook delete policies

## Source links

- https://kubernetes.io/docs/concepts/workloads/controllers/deployment/
- https://kubernetes.io/docs/concepts/workloads/pods/pod-lifecycle/
- https://www.postgresql.org/docs/current/explicit-locking.html
- https://www.postgresql.org/docs/current/functions-admin.html
- https://helm.sh/docs/topics/charts_hooks/

## FAQ

### How long do two versions actually run at the same time during a rolling deploy?

Longer than most people assume, and you do not set the number directly. A Kubernetes rolling update replaces pods in batches bounded by maxUnavailable and maxSurge, both defaulting to 25 percent, and a new pod only counts once it is ready and has stayed ready for minReadySeconds. If a readiness probe keeps failing the rollout stalls, and Kubernetes takes no action on a stalled Deployment beyond reporting a ProgressDeadlineExceeded condition, so the overlap can last indefinitely.

### Why should database migrations not run in application start-up?

Because every replica runs them. With more than one pod, several processes attempt the same migration simultaneously, and moving the work into an init container only multiplies it by pod count instead. The expensive failure is not the duplicate statement, it is the pod that crashes on the resulting error, fails readiness, and stalls the very rollout that defines your overlap window. Run migrations once per release as a separate job.

### How do I stop two migration jobs from running at once?

Guard the migration with a PostgreSQL advisory lock on a constant key. These locks are application-defined, so nothing enforces them but your own runner, which is exactly what is needed. Use pg_try_advisory_lock, which returns false immediately instead of waiting, so the losing process can skip and continue rather than block start-up. Session-level advisory locks are released implicitly at session end even after an ungraceful disconnect, so a killed pod does not leave the lock stuck.

### Can I roll back a deployment after the migration has already run?

Only if the migration was not destructive. Running kubectl rollout undo starts another rolling update in the opposite direction, but the schema does not roll back with the pods, so the previous release comes back against the schema you already changed. If that migration dropped or renamed anything the previous release still uses, the rollback path is gone. Keep every contract step out of a release you might want to undo.

### Which schema changes are safe to ship in a single deploy?

Very few. Adding a new table and adding a nullable column are genuinely safe, because the previous release never names either one in the SQL it generates. Adding NOT NULL, renaming, dropping, changing a type or adding a unique constraint all break the release that is still running, so each needs the full expand and contract sequence spread over several deploys with a backfill in between.

---

- HTML version: https://www.matthewswong.com/en/blog/zero-downtime-migration-rolling-deploy/
- Bahasa Indonesia: https://www.matthewswong.com/id/blog/zero-downtime-migration-rolling-deploy/
- Site index for agents: https://www.matthewswong.com/llms.txt
- Sitemap: https://www.matthewswong.com/sitemap.xml
- API description (OpenAPI): https://www.matthewswong.com/openapi.json